The physical design flow in VLSI explained step by step: inputs, import and sanity checks, floorplanning and power planning, placement, clock tree synthesis, routing, chip finishing and sign-off, how the timing model changes from stage to stage, hand-off QoR checks, worked examples, a debug flowchart and interview Q&As.

Physical design is where a synthesized gate-level netlist becomes a layout that a fab can build. Every step in the flow, from floorplan to sign-off, makes the next one easier or harder. A floorplan with a starved macro channel turns into placement congestion, then routing DRCs, then a setup failure that shows up only after extraction. If you know what each stage takes in, what it produces and which checks it must pass, you know where to go back when something breaks.

This guide walks through the physical design flow in VLSI step by step: inputs, import and sanity checks, floorplanning, power planning, placement, clock tree synthesis, routing, chip finishing and sign-off. It also shows how timing accuracy improves stage by stage, with hand-off checks, a debug flowchart and interview Q&As. Worked examples are illustrative: the numbers show the method and do not come from any foundry, library or project unless an open-source flow is named. Commands and stage names follow the open-source OpenROAD-flow-scripts (ORFS) because they are publicly documented; commercial tools have equivalent steps under other names.

What is physical design in VLSI?

Physical design (also called place and route, PnR or APR, automatic place and route) is the process of turning a gate-level netlist into a manufacturable layout, usually delivered as GDSII or OASIS. It sits between logic synthesis and tape-out. The netlist says which cells exist and how they connect; physical design decides where each cell sits and which metal carries each connection, while meeting:

Together these are usually summarized as PPA (power, performance, area).

The main stages are the same in every tool: import design, floorplan (with power planning), placement, clock tree synthesis, routing, and chip finishing/sign-off. The ORFS documentation splits the open-source flow into Synthesis, Floorplan, Placement, CTS, Routing and Finishing, and names its results files by stage: 1_synth, 2_floorplan, 3_place, 4_cts, 5_route and 6_final.

Flow diagram of the physical design flow: inputs, import design and sanity checks, floorplan and power planning, placement and optimization, clock tree synthesis, routing, finishing and sign-off, and GDSII to the foundry, with a dashed ECO loop from sign-off and routing back to placement
The physical design flow from netlist to GDSII, with the main work done at each stage.

Block level vs full-chip physical design

Large SoCs are not placed and routed in one run. The top level is split into partitions (blocks). Each block owner implements one partition against a budgeted set of constraints, and a full-chip (FC) owner assembles the blocks, routes the top-level nets and closes chip-level timing. Very large designs add a sub-FC level between the two. The flow inside a block is the one described here; the extra work at the top is pin and budget planning (Time Budgeting in VLSI) and assembly.

A full chip drawn as a rectangle containing hatched partitions Block A, Block B and Block C and top-level logic, next to a flow where the full-chip owner sets pins and budgets, block owners implement each partition to sign-off and hand back abstracts, and the full-chip owner assembles and verifies the chip
Block-level and full-chip implementation: budgets go down, abstracts come back up.

Inputs to the physical design flow

Input What it contains Used for
Gate-level netlist (.v) Cell instances and their connections, flat or hierarchical The design to implement
Timing libraries (.lib) Cell delay, transition, setup/hold, power per corner Timing and power optimization
Technology and cell LEF Layers, pitches, vias, rules; cell size, pins, obstructions Placement and routing
SDC Clocks, I/O delays, exceptions, design rules All timing-driven steps
Power intent (UPF) Power domains, supplies, isolation, level shifting, retention Multi-voltage and power-gated designs
Floorplan or scan DEF Die, pins, macro positions; scan chain ordering Reusing a floorplan; scan reordering
RC extraction rules Per-corner resistance and capacitance models of the metal stack Parasitic estimation and extraction

Missing or mismatched inputs break runs early, so the first step is to load and check them.

Step 1: Import design and sanity checks

The tool reads the libraries, LEFs, netlist, SDC and power intent and links them into one database. Before any optimization, check:

  • Linking: no unresolved references or black boxes (a module the tool has no library or LEF view for).
  • Netlist hygiene: no unexpected assign statements, multi-driven nets, floating inputs or tri-state drivers that the flow cannot handle.
  • Constraints: every warning from reading the SDC understood; every register clocked; no unconstrained I/O (see SDC Constraints in VLSI).
  • Power intent: UPF reads without errors and covers every domain crossing.
  • Timing correlation: a quick timing report right after import should be close to the post-synthesis timing from the sign-off STA tool. A large gap usually means a constraint or library mismatch, not a real timing problem, and optimizing against it wastes runtime.

In ORFS the floorplan script runs check_setup and reports any macro master that is loaded but not used in the netlist before it builds the floorplan.

Step 2: Floorplanning

Floorplanning fixes the die and core size, the standard-cell rows, the I/O pin positions, macro placement and the regions that must stay empty. Detailed guidance is in Floorplanning in VLSI and Macro Placement in VLSI; the essentials are:

  • Core size from target utilization (cell area divided by available core area) and aspect ratio (height over width).
  • Pin placement that follows the data flow to neighbouring blocks.
  • Macros at the edges with their pins facing the core, keep-out halos around them and wide enough channels between them.
  • Blockages (hard, soft, partial) to keep cells out of places that will congest.
  • Physical-only cells: well taps and endcaps inserted at this stage (see Physical-Only Cells in VLSI).
Top view of a block floorplan with numbered callouts: die boundary, dashed core boundary, power ring, vertical power stripes, dotted halos around two SRAM macros, a dotted partial blockage in the channel between them, standard-cell rows with follow-pin rails, and I/O pins on the die edge
Anatomy of a block floorplan (illustrative).

In ORFS the floorplan stage has four sub-steps: 2_1_floorplan (initialize die and core, make routing tracks, set routing layers), 2_2_floorplan_macro (macro placement), 2_3_floorplan_tapcell (tap and endcap insertion) and 2_4_floorplan_pdn (power grid generation). The floorplan can be initialized in exactly one of four ways: from a floorplan DEF, from an I/O footprint, from explicit die and core coordinates, or from CORE_UTILIZATION with an aspect ratio and core margin. The script stops with an error if more than one is given.

Worked example A: sizing the core from utilization (illustrative)

Synthesis reports 33,000 µm² of standard-cell area and there are no macros. The target utilization is 55% with a square core:

  • Core area = 33,000 / 0.55 = 60,000 µm².
  • Square core: side = √60,000 ≈ 245 µm.
  • With a 10 µm core margin on each side for rings and pins, the die is about 265 µm × 265 µm.

The 45% of core area not used by cells is not waste: it is where placement inserts buffers and resizes cells, CTS adds clock buffers, and routing finds room. Tools differ in whether macro area and halos are subtracted before computing utilization, so read your tool’s definition. (The 55% figure happens to match the CORE_UTILIZATION ?= 55 default in the public ORFS nangate45/gcd example, which is a tiny design.)

Power planning

The power distribution network (PDN) is built at the end of floorplanning: rings around the core or macros, stripes (straps) across the core on upper layers, and follow-pin rails on the standard-cell rows, connected by via stacks. The PDN must carry the current with acceptable IR drop and EM margin while leaving enough tracks for signal routing. See Power Planning in VLSI, and for switchable domains Power Gating in VLSI and Level Shifters in VLSI.

Step 3: Placement

Placement finds a legal location for every standard cell. It runs in stages:

  1. Global placement: spread cells to minimize wirelength under a density target, with timing- and routability-driven weighting.
  2. Optimization (pre-CTS): fix design rule violations (max transition, capacitance, fanout), buffer long nets, resize cells and repair setup using estimated wire parasitics (see DRVs in VLSI).
  3. Legalization and detailed placement: snap cells onto rows and sites without overlaps and improve locally.

Scan chains are usually reordered here so they follow placement rather than the synthesis order (Scan Chain Reordering in VLSI), and constant inputs are tied through tie cells. ORFS maps this to 3_1_place_gp_skip_io (global placement before pins are placed), 3_2_place_iop (I/O placement), 3_3_place_gp (global placement with placed pins), 3_4_place_resized (repair design and optionally timing) and 3_5_place_dp (detailed placement). Full detail is in Placement in VLSI.

Step 4: Clock tree synthesis (CTS)

Until CTS, the clock is ideal: it arrives at every register at the same time with whatever latency the SDC sets. Clock tree synthesis builds the real buffer or inverter tree that distributes each clock from its source to every sink, aiming for low skew (difference in arrival time between sinks), controlled latency (insertion delay), legal transition, and acceptable clock power. Clock nets are usually routed with non-default rules (wider, more widely spaced wires) for lower resistance and less crosstalk.

After CTS the timing analysis switches to propagated clocks, and the first real hold analysis becomes possible, because hold depends directly on actual skew. Post-CTS optimization fixes setup and inserts delay for hold. Some flows deliberately skew clocks to help setup (Useful Skew in VLSI).

In ORFS the CTS stage runs repair_clock_inverters, then clock_tree_synthesis with sink clustering and clock-net repair enabled, legalizes the new cells with detailed placement, estimates parasitics and, unless skipped, runs timing repair. See Clock Tree Synthesis (CTS) for the full stage.

Step 5: Routing

Routing creates the metal for every net. Global routing plans each net through a coarse grid of GCells against derated track capacity and reports congestion; track assignment and detailed routing produce exact wires and vias that obey every rule; post-route optimization re-times with extracted resistance, capacitance and coupling and fixes setup, hold, crosstalk, antenna and EM with incremental reroutes. Filler cells are inserted to complete the rows. ORFS runs 5_1_grt (global routing, which also repairs antennas and re-times on global-route parasitics), 5_2_route (detailed routing) and 5_3_fillcell. See Routing in VLSI, Crosstalk in VLSI and Antenna Effect in VLSI.

Step 6: Chip finishing and sign-off

The routed database is not yet a tape-out. Chip finishing adds metal (and sometimes other) fill to meet density rules, finalizes fillers and decaps, and writes the final netlist, DEF, SPEF and GDS. Sign-off then checks the result with sign-off-quality engines rather than the implementation tool’s internal estimates:

  • Parasitic extraction and sign-off STA in all modes and corners (Parasitic Extraction and SPEF, MMMC in STA, OCV, AOCV and POCV).
  • Physical verification: DRC with the foundry deck, LVS, antenna and ERC checks.
  • Power integrity: static and dynamic IR drop, EM on signal and power nets.
  • Logical equivalence between the post-route netlist and the synthesis netlist, so optimization has not changed function.
  • Low-power checks against the UPF where power intent applies.

Late fixes go through the ECO flow, followed by another round of the affected checks. In ORFS finishing is 6_1_fill (density fill, off by default via USE_FILL), 6_report (final reports and outputs such as 6_final.odb, 6_final.sdc and, with RCX rules set, 6_final.spef), GDS generation through KLayout (def2stream.py merges the DEF with cell GDS), and optional drc and lvs make targets using KLayout decks.

How timing accuracy improves through the flow

Each stage replaces an estimate with something closer to the truth. That explains why slack usually moves between stages, and why closing timing early with no margin is risky.

Top: a ladder of five stages, post-synthesis, post-placement, post-CTS, post-route and sign-off, showing the clock model changing from ideal to propagated with OCV and the wire model from wire-load to sign-off extraction. Bottom: a line plot of one path's slack falling from +0.12 ns after synthesis to -0.04 ns after routing, with open dots showing recovery after fixes at CTS and ECO
How the clock and wire models change through the flow, and one path’s slack in worked example B (illustrative).
Stage Clock model Wire model What usually changes
Post-synthesis Ideal, SDC latency and uncertainty Wire-load model or none Baseline; logic depth problems show here
Post-placement Ideal Estimated from placement (Steiner/HPWL-based) Long nets and placement detours appear
Post-CTS Propagated, real skew Estimated Hold becomes visible; skew moves setup
Post-route Propagated Extracted RC plus coupling (SI) Detours, resistive layers, delta delay
Sign-off Propagated, with OCV derates Sign-off extraction, all corners Corner and variation pessimism

Worked example B: following one path through the flow (illustrative)

A register-to-register path in a block with a 1.0 ns clock:

  • Post-synthesis: slack +0.12 ns with ideal clocks.
  • Post-placement: +0.05 ns. The two flops ended up far apart, and the estimated net delay grew by 70 ps.
  • Post-CTS: -0.03 ns. The capture flop’s clock arrives 80 ps earlier than the launch flop’s (negative skew for this path), which costs setup; the optimizer upsizes two cells and recovers to +0.01 ns.
  • Post-route: -0.04 ns. The long net detoured around a macro and picked up crosstalk delta delay from a parallel aggressor.
  • Fix: promote the net to an upper layer and upsize the driver in an ECO; slack returns to +0.02 ns in all corners.

Carry margin forward, and when a path breaks, compare reports across stages to see which estimate changed.

Real example: the ORFS gcd design

The public ORFS nangate45/gcd example shows how small the configuration for a full RTL-to-GDS run can be. Its config.mk sets the design name and platform, the Verilog and SDC files, CORE_UTILIZATION ?= 55, PLACE_DENSITY_LB_ADDON = 0.20 and its own PDN script. Its constraint.sdc defines core_clock on port clk with a 0.25 period (nanoseconds in that library), a virtual clock for I/O, a 0.070 clock latency on both, and input and output delays of 20% of the period on all non-clock ports. make runs every stage from synthesis to 6_final.

Stage-wise QoR checklist

Hand-off Must be true before moving on
Import No black boxes, SDC/UPF warnings understood, timing correlates with synthesis
Floorplan Macros fixed and legal, PG connected, channels sized, early congestion OK
Placement Legal, DRV-clean, setup within margin, no congestion hotspots
CTS Skew/latency on target, hold fixable, clock DRVs zero
Route No opens/shorts, DRC and antenna clean, timing met with SI
Sign-off All corners/modes met, DRC/LVS clean, IR/EM within limits, LEC passes

Debug flowchart: where to go back when a check fails

Debug flowchart for a failed hand-off check: check correlation between PnR and sign-off timing, congestion or DRCs in one region, setup failures before CTS, huge hold fixing after CTS, failures that appear only after routing, and sign-off DRC, LVS, IR or EM failures, each with where to go back and fix, ending with moving to the next stage
Where to go back when a hand-off check fails.

The rule behind the flowchart: fix a problem at the earliest stage that causes it. Thousands of routing DRCs in one region are a placement density or floorplan problem; hold violations that need hundreds of delay cells often point to a CTS or constraints problem; a timing failure that differs wildly between the PnR tool and the sign-off STA tool is a correlation problem, not a design problem.

Interview questions and answers

Q1. What are the main steps of the physical design flow?
Import design and sanity checks, floorplanning (including power planning), placement, clock tree synthesis, routing, and chip finishing with sign-off checks (STA, DRC, LVS, IR/EM, LEC), ending in GDSII.

Q2. What are the inputs to physical design?
The gate-level netlist, timing libraries (.lib), technology and cell LEF, SDC constraints, power intent (UPF) for multi-voltage designs, RC extraction rules, and optionally a floorplan DEF and scan DEF.

Q3. Why is hold not fixed before CTS?
Before CTS the clocks are ideal, so the real skew between launch and capture flops is unknown. Hold depends directly on that skew, so fixing it earlier would add the wrong delay cells.

Q4. What is utilization and why not use 100%?
Utilization is cell area as a fraction of available core area. The free space is needed for buffering, resizing, clock buffers, fillers and routing resources; very high utilization makes congestion and timing closure much harder.

Q5. Why does timing change after routing?
Placement and CTS use estimated wire parasitics. After routing, extraction gives real resistance and capacitance, including coupling to neighbours, and nets may detour or land on more resistive layers. Crosstalk delta delay also appears.

Q6. What is the difference between block-level and full-chip PnR?
A block is implemented against budgeted constraints and handed over as an abstract (LEF, timing model, netlist, GDS). Full-chip PnR places the blocks, routes the top-level nets and power, and closes chip-level timing and verification.

Q7. What checks are done at sign-off?
Sign-off STA in all modes and corners with extracted parasitics, DRC, LVS, antenna, ERC, IR drop and EM analysis, logical equivalence checking, and low-power checks where UPF applies.

Q8. What is GDSII?
The binary format of the final layout geometry, layer by layer, used by the foundry for mask making. OASIS is a more compact alternative.

For more short-answer practice, see our floorplan, placement, CTS and routing interview questions.

FAQ

Is synthesis part of physical design?
Usually not. Logic synthesis produces the netlist that physical design starts from. Many flows use physical-aware synthesis, which reads floorplan data so the netlist is closer to what placement will produce.

What is the difference between PnR and physical design?
In everyday use they mean the same thing. Strictly, PnR is the implementation part (floorplan to route), and physical design also includes sign-off verification.

Can I learn the flow without commercial tools?
Yes. OpenROAD-flow-scripts runs a complete RTL-to-GDS flow on public PDKs and platforms such as Nangate45 and SkyWater sky130, and its scripts show each step explicitly.

Summary

The physical design flow turns a netlist into GDSII in a fixed order: import and check the inputs, floorplan and build the power grid, place and optimize the cells, synthesize the clock tree, route, then finish and sign off. Each stage replaces an estimate with something more accurate: ideal clocks become propagated clocks, estimated wires become extracted RC with coupling. So slack and congestion move from stage to stage, and margin should be carried forward. Check QoR at every hand-off, and when a check fails, go back to the stage that caused the problem rather than forcing a fix at the end.

References

  • OpenROAD project README: flow stage overview for OpenROAD-flow-scripts (Synthesis, Floorplan, Placement, CTS, Routing, Finishing) and the list of physical design steps: https://github.com/The-OpenROAD-Project/OpenROAD/blob/master/README.md
  • OpenROAD-flow-scripts flow/Makefile (stage targets 1_synth to 6_report, GDS merge with def2stream.py, drc and lvs targets) and flow/scripts/ (floorplan.tcl, tapcell.tcl, pdn.tcl, resize.tcl, detail_place.tcl, cts.tcl, fillcell.tcl, density_fill.tcl, final_report.tcl, variables.yaml): https://github.com/The-OpenROAD-Project/OpenROAD-flow-scripts
  • ORFS Nangate45 gcd example, config.mk and constraint.sdc: https://github.com/The-OpenROAD-Project/OpenROAD-flow-scripts/tree/master/flow/designs/nangate45/gcd